At this stage, it is necessary to conduct an analysis of the processes and needs of the mining and processing plant to determine the functional and technical requirements for the automated control system
Based on the identified requirements, a concept of the automated control system is developed, including its structure, modules, operation algorithms, interfaces, etc.
At this stage, a detailed implementation plan for the system is developed, including the selection of necessary equipment and software, system architecture design, and technical solutions development.
Equipment is being installed on mobile and stationary objects. Software is being implemented to automate management processes and information gathering during work shifts. This involves the development of specialized programs, controllers, databases, and interfaces."
After the development and implementation of the system, testing is conducted to identify and address any deficiencies. Partial upgrades are made to ensure its proper functioning under real conditions
After the system is implemented, personnel training is conducted to operate it, followed by ongoing system maintenance to ensure its stable and efficient operation. This also includes upgrades and troubleshooting of issues that arise during operation